Menu
search

Facilities

Modular and Mobile Cleanrooms

We design and build cleanrooms and laboratory facilities for the healthcare, biocontainment, and biopharmaceutical markets.

Interior modular cGMP cleanroom

Purpose-Built Facilities to Address Capacity Limitations

Germfree builds mobile and modular cleanroom platforms for complex biopharma, biocontainment, and healthcare processes. You set the size, layout, and features to match your project, and our team stays involved from design through delivery.

  • Our cleanroom facilities close a real infrastructure gap, giving patients access to care they might not otherwise get.
  • Our biocontainment facilities let researchers and lab technicians work safely in remote locations around the world.
  • Our hospital compounding facilities provide swing space during renovations, cover surge capacity, and improve compounding efficiency.

Our Cleanrooms

Mobile

Mobile Cleanrooms

Germfree mobile facilities add capacity quickly in biopharma, biocontainment, and healthcare. Choose from 24-foot sprinter vans, cargo trailers, and 450-square-foot semi-trailers, lease or buy. Need it sooner? Pull one straight from our lease fleet.

  • We handle every piece of the project: site infrastructure audits, certification and commissioning paperwork, installation, procurement, quality control, and more.
  • Every facility is factory acceptance tested before it ships and site acceptance tested once it arrives, supporting your CQV efforts through commissioning.
  • Our service team supports facilities worldwide, 24/7, with preventative monitoring, diagnostics, and maintenance.

Our Mobile facilities

Scroll through our different mobile options

Global Deployment

Facilities can be sent anywhere in the world. We tailor process utilities and signage to the country they’re headed to.

Flexible Sizes

Standard mobile and modular facilities come in a range of sizes, so you’re not stuck fitting your process to ours.

Comprehensive Manufacturing

Every part of the project happens in-house, which is why mobile and modular projects go operational in a fraction of the time traditional construction takes.

Parallel & Integrated Delivery

Our team runs design and build in parallel, from concept drawing to site installation, avoiding the delays, cost overruns, and change orders that come with sequential construction.

Modular

Modular Cleanrooms

Germfree modular facilities are built on the same parallel and integrated model. Our Process Application, CQV, installation, quality control, and engineering teams work side by side from concept through installation, which is how we deliver modular facilities for biopharma, biocontainment, and healthcare that meet niche process and regulatory requirements with minimal site work.

  • Our healthcare facilities provide an aseptic environment, and our 100% stainless steel pharmacy equipment line protects both personnel and materials.
  • Our cGMP modular cleanrooms are a turnkey platform that supports both cGMP and cGMP/BSL-2 production.
  • Across biocontainment, we manufacture modular laboratories from BSL-2 through BSL-4, deployable anywhere in the world on an accelerated timeline.

Our Modular facilities

Scroll through our different modular options

Flexible Ownership Options

Lease or buy outright. Choose the ownership structure that fits your business and timeline.

Project management

We manage every part of deploying a facility: site infrastructure audits, certification and commissioning paperwork, installation, procurement, quality control, and more.

Factory Acceptance, Onsite Testing & CQV

Every facility goes through factory acceptance and site acceptance testing to support CQV. We produce a full set of documents that give regulatory bodies (USP, CDC, FDA, and others) objective evidence of facility performance.

Parallel & Integrated Delivery

Our team runs design and build in parallel, from concept drawing to site installation, avoiding the delays, cost overruns, and change orders that come with sequential construction.

What's the difference between Mobile and Modular?

Mobile facilities are built for quick deployment: added capacity, emergency response, or short-notice manufacturing needs. Modular facilities are built for the long term, tailored to your process and meant to stay in place. Both give you a controlled, clean environment; the difference is how permanent you need it to be.

Frequently Asked Questions (FAQ's)

  • What types of cleanroom facilities does Germfree build?

Germfree designs and builds mobile and modular cleanrooms and controlled environments across biopharma, healthcare, and biocontainment. That spans cGMP facilities for cell therapy, gene therapy, viral vectors, mRNA, and monoclonal antibodies, plus USP 797 and 800 compliant pharmacies, clinical labs, and BSL2 and BSL3 laboratories. Facilities are engineered offsite as complete environments, ready to commission sooner than a traditional build.

  • Can Germfree facilities be deployed globally?

Yes. Germfree designs, fabricates, and delivers facilities worldwide, engineering each one to the destination’s electrical standards, climate conditions, and building codes. International projects also meet local regulatory frameworks, from EU GMP guidelines to WHO biosafety standards and country specific licensing requirements.

  • Does Germfree support leasing and purchasing of facilities?

Yes. Purchasing gives full ownership and suits a long term program with a defined site, while leasing provides a fully operational facility without the capital outlay of a purchase, useful for budget constraints or a time limited need. Leased facilities meet the same standards and configuration options as purchased units.

  • How does Germfree support certification and commissioning?

Germfree manages certification and commissioning from the outset, starting with site infrastructure audits before fabrication is complete so site work can proceed in parallel. Documentation, equipment specifications, and qualification protocols are prepared as part of the project scope, and factory and site acceptance testing carry the process through without leaving customers to manage it alone.

  • What does “parallel and integrated delivery” mean?

Rather than running design, engineering, fabrication, and site preparation in sequence, Germfree overlaps them, so site work, utility installation, and permitting proceed while fabrication is underway. For programs under regulatory deadlines or operational urgency, this compresses the timeline in a way sequential delivery cannot match.

Case studies

View all case studies

Contact us: Let's deliver on your mission together

Complete our contact form and a member of our commercial team will reach out to you within 24 hours.
Service & support: cs@germfree.com

Send us your request