Please watch Germfree’s video featuring a recent project where we delivered a BSL-3 laboratory to East Asia and made the bio-containment lab operational in only 21 days.
This Biological Safety Level 3 (BSL-3) modular laboratory was manufactured by GERMFREE in the U.S. and then installed in East Asia.
In this video:
Germfree presents a truly unique approach to bringing advanced high containment laboratories to wherever they are needed… anywhere in the world.
Germfree designs, engineers and manufactures Biological Safety Level 3 (BSL-3) laboratories in our U.S. facility.
These containerized modular labs are then delivered and installed in locations across all continents.
After manufacture, the lab is transported as containerized units to be reassembled at the site. This method makes easy global deployment a new possibility for high containment labs.
BSL-3 labs require a range of critical steps after completion of construction and prior to laboratory operation. These processes traditionally take 6 months to over a year. This Germfree project took just 21 days from on-site setup to meeting all operational requirements, making the BSL-3 lab ready for use.
With Germfree’s advances in biosafety engineering and manufacturing, high containment laboratories can now become operational in an unprecedented time frame.