Viral Vector Mobile Cleanroom Tampa
Facility:
Mobile BSL-2LS cGMP Cleanroom
Application:
Viral Vector Production
Location:
Tampa, Florida
Completion:
July 2023
Mobile cGMP Cleanroom for Viral Vector Production in Tampa
Germfree Laboratories developed a Mobile cGMP Cleanroom to help facilitate Viral Vector Production in Tampa.
Project features
Size: 900 sq. ft. of cleanroom and mezzanine space
Layout configurations: Two 53’ cleanrooms joined together with our innovative vestibule containing changing and locker facilities for the staff. The facility achieves unidirectional flow for material and bidirectional flow for personnel through ISO7 suite.
Facilities/Equipment: Two Germfree custom cGMP Mobile Cleanrooms outfitted with custom Germfree casework and sinks.
The challenge
This mobile facility showcases our expertise in meeting stringent cGMP compliance within a mobile platform. It offers an efficient and rapid solution for Phase I/II clinical trials, encompassing every stage of viral vector production—from cold storage and purification to final formulation before shipment.
The answer
Germfree provided an innovative solution by designing and manufacturing a mobile BSL-2LS cGMP facility consisting of 2 prefabricated trailers. The facility includes approximately 900 sq. ft. of cGMP manufacturing and mechanical space. The facility layout incorporates strong segregation to support multiple campaigns occurring at the same time.
Given the nature of starting materials and the substrates/agents being manufactured, this facility was built to meet the Center for Disease Control (CDC) guidelines for Biosafety Level 2 Large Scale (BSL-2LS).
Prefabricated trailers supported the accelerated timeline by manufacturing the cleanrooms while the client prepared the site utilities and support infrastructure. This reduced the overall project duration by several months.
Germfree’s team of experts created a state-of-the-art BSL-2LS cGMP facility that was carefully engineered to provide unidirectional process flow and robust primary engineering controls to ensure a safe and efficient working environment.
This facility was built using Germfree’s proven mobile cleanroom platform, click here to learn more about our mobile cleanrooms!
Read about the unique process we used to deliver this project and how we can deliver yours.